Course / Course Details

Mastering Claims, Delays & EOT(Extension of Time) in Projects

  • EDGE-Project Controls image

    By - EDGE-Project Controls

  • 0 students
  • N/A
  • (0)

Course Requirements

WHO CAN DO THIS COURSE?

• Planning Managers
• Construction Managers
• Planning & Scheduling Engineers
• Civil/Elec/Mech/Arch Engineers
• Fresh Engineering Graduates
• Construction Management Professionals
• Those who want to work as a Planning Engineer in EPC Projects

COURSE DELIVERY

This course is offered Online as well as in Classroom based on requirements

FEE AND ADMISSION

For course fees, kindly contact us on +91-8121904524

Course Description

Time Extension Requests: Preparation and Defense

Every Time Extension Request must stand on its own merit, thoroughly analyzed, and meticulously documented. It should be robustly substantiated, leaving no room for doubt regarding its validity. This course is designed to provide a comprehensive understanding of the principles and techniques involved in the preparation and defense of Time Extension Requests. Participants will gain deep insights into the fundamental concepts of delays, including how to track and mitigate them effectively. 

Key topics include:

Establishing and analyzing the baseline schedule.

Assessing the impact of delays on project timelines.

Formulating strategies to address and resolve delays.

The course will also deliver a step-by-step guide to preparing a detailed Extension of Time Request. This includes addressing associated prolongation and disruption costs, ensuring that the request is both technically sound and persuasive. Through this program, attendees will enhance their ability to navigate complex scheduling challenges, presenting well-founded and credible extension requests with confidence.

Unique Competitive Advantage of This Course

This course offers an unparalleled competitive edge by incorporating a hands-on approach through a real-world case study project. Participants will actively apply the claims techniques learned during the course, transforming theoretical knowledge into actionable expertise.The case study is designed to enable participants to develop the critical documents and deliverables required for effective claims preparation and defense.

These include:

Document and Correspondence Compilation

Identifying, collecting, and organizing all relevant project documents and correspondences.

Chronology of Events

Crafting a comprehensive events timeline, accompanied by discussion points tailored for project managers.

Event-Specific Templates

Developing reusable templates for team discussions and client clarifications, ensuring consistency and clarity for each event.

Supporting Documentation

Drafting substantiating letters to provide robust evidence for each identified event.

Extension of Time (EOT) Log

  • Creating a structured log that consolidates all essential data related to EOT claims for easy reference.

Master Primavera Influence Schedule

Preparing a comprehensive influence schedule that integrates all identified delays and events.

Event-Specific Primavera Schedules

Developing individual Primavera schedules to illustrate the impact of each of the events on the project timeline.

Detailed Claim Narrative Report

Producing a persuasive narrative report that clearly documents project delays and supports the justification for claims. This practical, case-based methodology ensures participants gain not only technical knowledge but also the confidence and expertise to tackle real-world claims challenges effectively.

How FIDIC Red Book 1999 helps you in drafting & defending Claims & EOT

Strategies for Avoiding Penalties Due to Project Delays- Techniques to defend against penalties and proactively prevent delays 

Delay Analysis and Mitigation- Identifying key areas of project delays and addressing the most critical issues effectively.

Effective Delay Reporting- Best practices for reporting project delays with clarity and precision.

Creating Influence Schedules in Primavera- Developing schedules to support project delay claims with robust evidence. 

Estimating Concurrent Delays- Accurately calculating project delays in days when dealing with multiple concurrent delay events. 

Defending Claims in Client Discussions- Strategies to prepare and present claims effectively during client meetings.

Step-by-Step Case Study- Hands-on development of an Extension of Time (EOT) claim based on a realistic project scenario.

Course Outcomes

At the completion of this course, the student will be able to:

Learning Outcomes


  • Define delays
  • Describe the different types of delays
  • Depict issues related to each delay
  • Define the baseline schedule
  • Differentiate between baseline schedule and other target schedules
  • Define the important milestones in the baseline schedule^ Maintain a baseline schedule
  • Monitor critical and near critical activities
  • Track effect(s) of delay(s) on a project
  • Maintain contractual requirements related to delays and EOT 
  • Define the different types of delay analysis
  • Determine which type of delay analysis is best to the case
  • Run a delay analysis
  • Know when to run a delay analysis
  • Use Primavera P6 for delay analysis
  • Familiar with related Primavera P6 interfaces
  • Calculate delays based on the delay analysis
  • Mitigate delays
  • Determine which delays should be mitigated
  • Recognize which costs are related to delay mitigation
  • Know what an acceleration plan is
  • Determine when an acceleration plan should be prepared
  • Know what to include in the acceleration
  • How to prepare an acceleration plan 
  • Who should prepare the acceleration plan 
  • Know the effect of stakeholders on the acceleration plan 
  • Know how an acceleration plan can be successfully implemented 
  • Know about prolongation costs
  •  Learn how to calculate prolongation costs 
  • Recognize what needs to be included in prolongation costs 
  • Determine contractual requirement(s) related to prolongation costs 
  • Describe disruption
  • Recognize what to include in disruption
  • Learn how to calculate disruption
  • Know the requirements of calculating disruption
  • Recognize the challenges related to prolongation costs and disruption calculations
  • Know the importance of document management to support EOT 
  • Determine what documents should be included in EOT 
  • Determine what to look at when defending an EOT

CERTIFICATE

Certificate
A certificate of completion will be issued to those who attend and complete the program.
Course Material
Customized Training Manual will be provided
Course Format
Computer-based workshops. EDGE-SCOM uses Primavera software for conducting training.

DOWNLOAD BROCHURE

Course Curriculum

  • 11 chapters
  • 0 lectures
  • 0 quizzes
  • N/A total length
Toggle all chapters

Instructor

EDGE-Project Controls

As the Super Admin of our platform, I bring over a decade of experience in managing and leading digital transformation initiatives. My journey began in the tech industry as a developer, and I have since evolved into a strategic leader with a focus on innovation and operational excellence. I am passionate about leveraging technology to solve complex problems and drive organizational growth. Outside of work, I enjoy mentoring aspiring tech professionals and staying updated with the latest industry trends.

0 Rating
0 Reviews
0 Students
7 Courses

Course Full Rating

0

Course Rating
(0)
(0)
(0)
(0)
(0)

No Review found

Sign In or Sign Up as student to post a review

Student Feedback

Course you might like

You must be enrolled to ask a question

Students also bought

More Courses by Author

Discover Additional Learning Opportunities